Skip to content
Before verification · For manufacturers and EPD consultants

Get your EPD verified sooner.

Every round of verifier comments costs you days of work and weeks of waiting. Lodestellar checks your EPD and its background report before the verifier sees them, so you fix the problems first and the EPD is published sooner.

Sold as part of a company plan. Ask us for one.

In six years of our own verification work, 6 of 10 verification comments were about the background report, not the EPD. So we check both.

Part of Pre-verification Check in the Lodestellar app, shown on an invented sample document
Pre-verification Check in the app, on an invented sample document.
How it works

Check your own EPD before it goes out.

1. Upload the background report and the EPDs

Before they go to your verifier. Drafts are fine.

2. Get the list of what to fix

Each finding says what is wrong, where, which rule it comes from, and how to fix it.

3. Fix it and check again

Fix what the check found and check again, until the EPD is ready for your verifier.

What you get

Every finding tells you what to fix, and where.

One finding from the public sample report, on an invented EPD. In a project the same findings also cover the background report, the PCR, and the numbers between the documents.

Open the sample report →
Numerical inconsistency

Packaging mass inconsistency

Statement
The packaging-material declaration contains inconsistent masses and percentages; the individual packaging values must reconcile with their totals and with the declared unit.
Applies to
1.1. Content Declaration · 2.2.3.2. A5. Installation in the Building
Checklist item
ECO Platform Verification Guidelines for ECO EPD Programme Operators (Version 8.0), 2.7
References
EN 15804:2012+A2:2019, clause 7.1; applicable PCR; LCA project report
Suggestion
Confirm the allocated LDPE and pallet masses per kilogram of product, correct the total mass and percentages, and use the same verified pallet quantity in the content declaration and A5 scenario.

What is checked

The EPD, the background report, and the numbers between them.

  • The standard: EN 15804+A2 or ISO 21930, and ISO 14025
  • Your programme operator's own rules
  • The product PCR or c-PCR your EPD follows
  • The numbers in the EPD against the background report
  • Missing statements, wrong module labels, old datasets and other things verifiers comment on

Lodestellar checks documents. It does not write or change your EPD, and it does not replace your verifier. Have a question about your EPD first? Ask the free EPD Assistant.

Coverage

What is covered today.

Standards
EN 15804+A2, ISO 14025, ISO 21930. An EPD made under EN 15804+A1 is checked against EN 15804+A2.
Programme operators with their own rules
International EPD System, IBU (Institut Bauen und Umwelt), INIES (FDES), Kiwa-Ecobility Experts, RTS (Rakennustieto), Smart EPD, ECO Platform (its shared rules for member programmes), EPD Hub, SCS Global. For EPD Hub and SCS Global, the programme rules run on the EPD; the background report is checked against the standards. An EPD from any other programme is checked against the standards.
Product PCRs and c-PCRs
EN 16757 concrete; IBU Part B: windows and doors, pumps for liquids, automatic doors and gates, drive systems for automatic doors and gates, structural steels; International EPD System c-PCR 008 lifts; DAPHabitat sanitary ware. They run when the EPD follows them.

Your documents stay yours

We treat your documents as business data.

A background report holds confidential business data. Everything you upload is encrypted, stored in the EU, never used to train AI models, and deleted whenever you ask.

What customers say

“From a verifier's perspective, Lodestellar acts like an extra pair of eyes. It gives a quick overview of potential issues, shows where the relevant requirement comes from, and helps highlight things that are easy to miss in complex models and documents. Used before formal verification, it helps developers fix basic issues earlier and reduces unnecessary back-and-forth.”
Callum · EPD verifier
“Lodestellar gives us real confidence before we send an EPD to the verifier. We've learned a lot about EPDs along the way — there's always more to learn, but Lodestellar makes the feedback so accessible. It's the kind of feedback verifiers simply don't have time to give you.”
Pirjo · Manufacturer

Pre-verification Check

Company plan

Sold as part of a company plan. Write to [email protected], or create a free account and ask for it in the app. We usually answer within two business days.

What you get

  • A project is one background report and its EPDs. One check reads up to 20 documents
  • Check, fix and check again: every check of the project is included, within fair use
  • The EPDs of the project are included, within fair use
  • Findings in about half an hour. We email you when they are ready
Already have an account? Log in

How buying works is on the How to buy page. Need an invoice, an NDA or your own terms? See company plans.

When it goes to the verifier, the Verifier Workspace carries the verification itself. Verifier Workspace →