Skip to content

02 During verification · For EPD verifiers

Verify more EPDs. Keep the judgement.

The Verifier Workspace runs the systematic checks across the EPD, its background report and the PCR. You spend your time on the calls that need a verifier, and send the developer a clear communication log.

Sold as part of a company plan. Ask us for one.

Part of Verifier Workspace in the Lodestellar app, shown on an invented sample document
Verifier Workspace in the app, on an invented sample document.

What you get

The AI proposes. You decide.

One finding from the public sample report, on an invented EPD, as the workspace proposes it. Raise it, close it, or close it and remember the decision for this project, this EPD developer or all your work.

Open the sample report →
Numerical inconsistency

Packaging mass inconsistency

Statement
The packaging-material declaration contains inconsistent masses and percentages; the individual packaging values must reconcile with their totals and with the declared unit.
Applies to
1.1. Content Declaration · 2.2.3.2. A5. Installation in the Building
Checklist item
ECO Platform Verification Guidelines for ECO EPD Programme Operators (Version 8.0), 2.7
References
EN 15804:2012+A2:2019, clause 7.1; applicable PCR; LCA project report
Suggestion
Confirm the allocated LDPE and pallet masses per kilogram of product, correct the total mass and percentages, and use the same verified pallet quantity in the content declaration and A5 scenario.
Your decision RaiseCloseClose and remember

How it works

A verification from the first upload to the last round.

Lodestellar does not replace verifiers. Independent verification runs on expert judgement, and that stays with you. The workspace takes the mechanical checks, so one verifier can carry more projects.

  1. 01

    One upload for the whole document set

    Drop in the background report, the EPDs, supporting documents and the c-PCR. Lodestellar sorts each file itself, and checks every layer: the standards, the programme rules and the product PCR or c-PCR. The numbers in the EPD are compared with the background report.

  2. 02

    You decide each finding

    Raise it, close it, or close it and remember the decision for this project, this EPD developer or all your company's work. The AI proposes. You decide.

  3. 03

    Send the communication log

    Your raised comments become a log for the EPD developer, each one tied to the place in the document it is about. Send it by link or as a Word file.

  4. 04

    Follow-up rounds show what changed

    The developer's answers are checked again: addressed, partly addressed or not addressed. New text is marked, so you read what changed, not the whole report again.

Also in the workspace

Built for verifying someone else's EPD.

  • A queue of your projects: which verifications wait on you and which wait on the developer
  • Decisions remembered per project, per EPD developer or for all your work, so the same finding does not come back
  • Verifying against a programme checklist, a PCR or a standard that is not covered yet? Upload it with the documents, and the round checks against it too

Coverage

What is covered today.

Standards
EN 15804+A2, ISO 14025, ISO 21930. An EPD made under EN 15804+A1 is checked against EN 15804+A2.
Programme operators with their own rules
International EPD System, IBU (Institut Bauen und Umwelt), INIES (FDES), Kiwa-Ecobility Experts, RTS (Rakennustieto), Smart EPD, ECO Platform (its shared rules for member programmes), EPD Hub, SCS Global. For EPD Hub and SCS Global, the programme rules run on the EPD; the background report is checked against the standards. An EPD from any other programme is checked against the standards.
Product PCRs and c-PCRs
EN 16757 concrete; IBU Part B: windows and doors, pumps for liquids, automatic doors and gates, drive systems for automatic doors and gates, structural steels; International EPD System c-PCR 008 lifts; DAPHabitat sanitary ware. They run when the EPD follows them.

Your documents stay yours

We treat your documents as business data.

The documents of a verification are the developer's confidential business data. Everything you upload is encrypted, stored in the EU, never used to train AI models, and deleted whenever you ask.

How to get it

Verifier Workspace

Sold as part of a company plan. Write to [email protected], or create a free account and ask for it in the app. We usually answer within two business days.

Already have an account? Log in

What you get

  • A project is one background report and its EPDs
  • Every review round the verification takes, within fair use
  • The EPDs of the project are included, within fair use
  • Each round is checked in about an hour. We email you when it is ready

How buying works is on the How to buy page. Need an invoice, an NDA or your own terms? See company plans.

What customers say

“From a verifier's perspective, Lodestellar acts like an extra pair of eyes. It gives a quick overview of potential issues, shows where the relevant requirement comes from, and helps highlight things that are easy to miss in complex models and documents. Used before formal verification, it helps developers fix basic issues earlier and reduces unnecessary back-and-forth.”
Callum, EPD verifier
“It's particularly useful for catching small but potentially confusing issues, like incorrect module subtitles — things you easily miss yourself because you already know what's meant when reading. The same goes for textual inconsistencies you overlook because you're carrying extra context from the background report.”
Anonymous, EPD verifier